Technical readiness is assessed in stages: site and load survey, engineering feasibility, regulatory and grid-connection review, and environmental screening. Each stage is documented before commitments are made.
Environmental feasibility protocols and grid compliance requirements are confirmed against the applicable regulations for each site. Where a detail has not been verified, it is left open rather than estimated.